We worked with Southern New Hampshire Poured Concrete during the construction of a 400-linear-foot retaining wall that bordered one side of a new synthetic turf multi-purpose athletic field at our High School stadium. They were reliable, extremely professional at all times, and ran a well-organized and efficient job site. Above all their finished product was of the highest caliber workmanship. The job presented some unforeseen challenges that Southern New Hampshire took in stride with a team of well-trained personnel. Should the opportunity arise, I would use them again without question.
380 Feet of Building
The wall had some complexity to it with 2 different form liners one being a old brick pattern and the other a rough stone pattern in each panel.
4500 Pounds of Concrete
Wall height from footing to top of smooth curb is 15' and then the columns extend up another 3'-7" above that.
80 Tons of Rebar
We could only place 2 sections and 2 piers at a time as the design had construction joints every 25' which ended on the edge of a column.