New Industrial park
New Hampshire
This project consisted of 4 buildings for a long-time customer.
0
Total Yards
Foundation walls ranged from 15’ high to 5’ with over 35 ton of rebar installed and set over 200 anchor bolt settings for the steel structure. Interior slabs placed at a depth of 8” with fiber for the heavy loading.
0
Man Hours
Builder/Contractor: Steve Chasse















