P.R. Russell Building
Brentwood, NH
Large storage building for product storage needed 13ft-high walls.
0
Sq/Ft Of Building
This project included a 13ft-high wall that had a thickness of 12in. Each of the pilasters required a 6in x 6in angle iron-embedded at all corners.
0
Days To Complete
In a three-week period, Southern NH Concrete placed 350 yards of concrete and 30 tons of rebar.
0
Man Crew
Our crew poured the foundation for a building that P.R. Russell would use for bulk storage materials.