Yards Of Concrete

Southern NH Concrete poured a 19ft retaining wall with a brick ledge built-in that was between 5 – 8in thick. We built two sloped walls with a shelf to support stairs. In addition, the walls slope 12ft in elevation and 23ft in length.

0
Days To Complete

We placed 100 yards of concrete and installed 8 tons of rebar.

0
Man Crew

The contractor for this project was Windover Construction out of Beverly, MA.